Case Study: Exterior Cleaning Works at Carnoustie Hotel
Case Study: Exterior Cleaning Works at Carnoustie Hotel
Project: Large-Scale Exterior Cleaning & Refurbishment Support
Location: Carnoustie, Angus
Client: Carnoustie Hotel & Spa
Project Overview
Ecoguard Scotland was appointed to deliver a comprehensive exterior cleaning programme at the Carnoustie Hotel & Spa, a landmark coastal hotel overlooking the world-famous Carnoustie Championship Golf Links.
The works formed part of a wider refurbishment project, carried out while the hotel remained fully operational and while other contractors were simultaneously completing internal renovation works. Due to the scale of the building, its prominent location, and constant guest activity, careful planning, coordination, and safe working practices were essential throughout the project’s six-week duration.
Scope of Works
The project covered all major external surfaces across the hotel complex, requiring specialist equipment, controlled cleaning methods, and phased delivery to minimise disruption to guests and hotel operations.
Works undertaken included:
Slate Roof Cleaning
Cleaning of an extensive 4,000m² natural slate roof
Removal of moss, lichen, and organic growth using roof-safe cleaning systems
Works carried out in phases to maintain safety and operational continuity
Painted Harling Cleaning
Cleaning of the hotel’s painted harling elevations
Careful removal of surface soiling, environmental staining, and organic growth
Methods selected to protect coatings and preserve the finish
Paths, Walls & External Surfaces
Pressure washing of boundary walls, footpaths, and service routes
Restoration of heavily trafficked pedestrian areas
Outdoor Patio & Guest Areas
Thorough cleaning of the outdoor patio areas where guests sit and enjoy views over the iconic 1st tee and 18th green
Works carefully scheduled to avoid peak guest use and hospitality events
Ensured clean, safe, and visually impressive spaces for guests
Working on a Live Hotel Site
One of the key challenges of this project was delivering large-scale external works across a busy, fully functioning hotel in a high-profile tourist location.
Key considerations included:
Continuous guest movement and outdoor use of spaces
Hotel access points, drop-off zones, and service areas remaining open
High visibility of works from guest rooms and public areas
In addition, Ecoguard Scotland worked alongside other trades carrying out internal refurbishment works, requiring daily coordination to avoid clashes and maintain safe access for all parties.
Health, Safety & Project Coordination
Safety and organisation were central to the success of the six-week programme. Measures included:
Detailed risk assessments and method statements
Phased work zones with clear signage and segregation
Coordination meetings with hotel management and other contractors
Flexible scheduling to adapt to hotel operations and weather conditions
All works were carried out with minimal noise, disruption, and visual impact wherever possible.
Outcome
The completed cleaning programme dramatically improved the appearance of the Carnoustie Hotel’s exterior. Roofs, walls, paths, and guest areas were restored to a clean, well-maintained standard befitting one of Scotland’s most prestigious golf destinations.
The project was completed safely, on schedule, and without disruption to hotel operations, contributing to the overall success of the wider refurbishment works.
Ecoguard Scotland Expertise
This project demonstrates Ecoguard Scotland’s ability to:
Deliver large-scale exterior cleaning projects over extended programmes
Clean extensive slate roofing safely and effectively
Work efficiently on live hospitality sites
Coordinate with multiple trades on complex refurbishment projects
Maintain high safety and presentation standards in high-profile locations