Case Study: Exterior Refurbishment of Monifieth Medical Centre
Case Study: Exterior Refurbishment of Monifieth Medical Centre
Project: Full External Cleaning & Refurbishment
Location: Monifieth, Angus
Client: Monifieth Medical Centre / Facilities Management
Project Overview
Ecoguard Scotland was appointed to carry out a comprehensive exterior refurbishment programme at Monifieth Medical Centre as part of a planned improvement of the building’s external appearance and functionality.
The scope of works covered all key external surfaces, from roofing and rainwater goods to render, glazing, hard landscaping, and signage. The project was completed while the medical centre remained fully operational, requiring a carefully planned approach to safety, access, and sequencing.
Scope of Works
The project involved a wide range of specialist exterior cleaning services, delivered in a coordinated programme to minimise disruption and maintain safe access for patients, staff, and visitors.
Works undertaken included:
Roof Cleaning
Large-scale roof cleaning using specialist roof cleaning equipment
Safe access provided via MEWP (Mobile Elevating Work Platform)
Removal of moss, lichen, and organic growth to improve appearance and drainage performance
Gutter Cleaning
Full gutter clearance using industrial gutter vacuum systems
Carried out without the need for invasive access or disruption below
Ensured free-flowing rainwater systems and reduced risk of blockages
Render Cleaning
Softwash cleaning of rendered elevations
Removal of organic staining and surface soiling using controlled, low-pressure methods
Preserved the integrity and finish of the render
Window Cleaning
Thorough external window cleaning to all elevations
Improved natural light and overall building presentation
Hard Landscaping & External Areas
Pressure washing of a large monoblock car park area
Re-sanding of joints to stabilise the surface and restore appearance
Pressure washing of paving slabs, footpaths, and pedestrian routes
Detail & Feature Cleaning
Cleaning of external signage and smaller architectural features
Ensured a consistent, refreshed appearance across the entire site
Working on a Live, High-Traffic Site
One of the key challenges of this project was delivering extensive exterior works while the medical centre remained open and fully operational.
Key considerations included:
High volumes of patients attending appointments throughout the day
Continuous pedestrian and vehicle movement
Maintaining clear, safe access routes at all times
Ecoguard Scotland implemented strict site management and safety procedures, including:
Phased works to avoid peak patient times where possible
Clear segregation of work areas using barriers and signage
Daily coordination with centre management
Use of appropriate access equipment to minimise ground-level disruption
Health, Safety & Organisation
Safety and organisation were central to the success of the project. All works were carried out in line with detailed risk assessments and method statements, ensuring:
Safe operation of MEWPs
Controlled use of cleaning systems and equipment
Minimal noise and disruption during clinic hours
Protection of staff, patients, and visitors at all times
Outcome
The completed works significantly enhanced the appearance and condition of Monifieth Medical Centre. Roofs, walls, glazing, and external areas were restored to a clean, professional standard, improving both the visual impact and long-term maintenance of the building.
The project was delivered on schedule, with no disruption to medical services, demonstrating Ecoguard Scotland’s ability to manage complex, multi-discipline exterior works on busy, live sites.
Ecoguard Scotland Expertise
This project highlights Ecoguard Scotland’s strengths in:
Large-scale exterior refurbishment projects
Specialist roof and gutter cleaning
Softwash render cleaning
Hard landscaping and car park cleaning
Working safely and efficiently on live, high-traffic sites